Projects.
Our fleet of well maintained and capable vessels have assisted in a range of projects below.
Levanter assisting with a salmon pen relocation in the outer Pelorus Sound.
Levanter arriving at Ngamahau bay, Tory channel with a new cage for the New Zealand King Salmon Marine Farm.
Tug Levanter and barge harvest star southbound from Tauranga for Timaru with large storage tank built by contract mechanical services.
Rossco arriving in Shakespeare Bay with another New Zealand king salmon pen which has reached the end of its time for removal and demo.
Tug Rossco and barge Geronimo assisting Smith Crane and construction with the removal of old lighthouse for ports of Lyttelton
Geronimo under tow from Rossco heading out the Queen Charlotte Sound for Auckland.
Geronimo being loaded with logs in the Pelorus sound.
Harvest star loaded with export logs destined Picton from a site in the queen Charlotte.
Harvest Star spudded on site outside the cut in port nelson on a seabed core sampling project.
Patiki delivering a house and building materials to East bay, Arapawa island.
Patiki in Port Tarakohe, Golden Bay with Engineering Solutions Limited for the upgrade of the old pile berths to the new SF pontoon berths.
Patiki discharging mud at Gollans bay spoil ground from LPC cruise terminal project with HEB construction
Patiki working with Crafar Crouch construction Picton in Onahau bay Queen Charlotte Sound.
Patiki on site in Port Nelson assisting McConnell Dowell with rock placement as part of the port nelson main wharf north construction
Patiki coming in to unload spoil from a channel dredging project in Havelock for Port Marlborough.
Self propelled barge Patiki, on location in Waikawa bay with Prodrill, core sampling for the Waikawa marina extension.